...
首页> 外文期刊>Trenchless International >River crossing with Direct Pipe
【24h】

River crossing with Direct Pipe

机译:直管河道

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Michels Canada completed the first installation in Canada utilising the Direct Pipe method when it completed a 1,122 ft crossing under the Beaver River. The beaver river installation is part of the Inter Pipeline Cold Lake and Polaris Expansion program, which includes installation of 560 km of underground pipeline for distribution between Edmonton and Fort McMurray. The expansion program, which was announced in July 2012, followed the signing of a binding Shipper Support Agreement for Inter Pipeline to provide bitumen blend and diluent transportation services to three major oil sands projects. Based on this agreement, Inter Pipeline began integrated expansion plans on its Cold Lake and Polaris pipeline systems at a capital cost of approximately $CAD2.1 billion.
机译:米歇尔加拿大分公司在比弗河下完成了1,122英尺的穿越时,就使用直接管道法完成了加拿大的第一项安装。海狸河的安装是Inter Pipeline Cold Lake and Polaris Expansion计划的一部分,该计划包括安装560公里的地下管道,以在埃德蒙顿和麦克默里堡之间分配。扩建计划于2012年7月宣布,随后签署了具有约束力的托运人支持协议,为国际管道运输公司(Inter Pipeline)向三个主要油砂项目提供沥青混合料和稀释剂运输服务。根据该协议,Inter Pipeline开始了其Cold Lake和Polaris管道系统的整合扩建计划,资本成本约为21亿加元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号