首页> 外文期刊>Transportation Research Record >Quality Control Procedures for Underwater Inspections: Ensuring That What Is Out of Sight Is Not Overlooked
【24h】

Quality Control Procedures for Underwater Inspections: Ensuring That What Is Out of Sight Is Not Overlooked

机译:水下检查的质量控制程序:确保看不见的东西不被忽视

获取原文
获取原文并翻译 | 示例
           

摘要

For more than 20 years, the FHWA has required that underwater inspection of bridges be performed at least every 5 years. Over that period, departments of transportation and other bridge owners have either developed in-house underwater inspection teams or hired outside consultants to perform this work. Ensuring that the inspections are conducted properly and accurately is critical. To this end, several policies and procedures can be implemented as quality control measures in an underwater inspection program. Selecting a properly trained inspection team, ensuring proper preparation before diving operations, conducting independent inspections, and looking at deterioration trends are several ways to ensure quality in underwater inspections.
机译:20多年来,FHWA要求至少每5年对桥梁进行一次水下检查。在此期间,交通运输部门和其他桥梁所有者已经建立了内部水下检查小组或雇用了外部顾问来执行这项工作。确保正确正确地进行检查至关重要。为此,可以在水下检查程序中实施一些政策和程序作为质量控制措施。选择训练有素的检查组,确保在潜水操作之前进行适当的准备,进行独立检查以及查看劣化趋势是确保水下检查质量的几种方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号