...
首页> 外文期刊>Transportation Research Record >Analysis of Time-of-Day Pricing Impacts at Port Authority of New York and New Jersey Facilities
【24h】

Analysis of Time-of-Day Pricing Impacts at Port Authority of New York and New Jersey Facilities

机译:分析纽约港口管理局和新泽西设施的每日定价影响

获取原文
获取原文并翻译 | 示例
           

摘要

Time-of-day pricing policies provide lower toll rates during off-peak hours to reduce peak-hour traffic congestion. Time-of-day pricing was introduced at the Port Authority of New York and New Jersey (PANYNJ) bridges and tunnels on March 25, 2001, for E-ZPass users only. According to PANYNJ, 2 months after the implementation of the program, preliminary statistics indicated greater use of E-ZPass and some increase in off-peak travel. PANYNJ operates six toll facilities: George Washington Bridge, Lincoln Tunnel, Holland Tunnel, Bayonne Bridge, Goethals Bridge, and Outerbridge Crossing. In this paper, the relationship between toll price and travel demand at PANYNJ facilities was investigated with traffic data before and after the introduction of the time-of-day pricing program. Two main approaches were used. First, short-term elasticities were calculated with monthly traffic data from April through August for 2000 and 2001. Next, medium-term elasticities were calculated with monthly traffic data from May through August for 2000 and 2002. Seasonal variations in the database were also considered by performing related statistical tests.
机译:时段定价政策在非高峰时段降低了通行费,以减少高峰时段的交通拥堵。 2001年3月25日,纽约和新泽西州港口管理局(PANYNJ)的桥梁和隧道引入了时段定价,仅针对E-ZPass用户。根据PANYNJ的说法,该计划实施2个月后,初步统计数据显示E-ZPass的使用增多,非高峰旅行有所增加。 PANYNJ运营六处收费站:乔治华盛顿大桥,林肯隧道,荷兰隧道,巴约讷大桥,哥达士大桥和外桥道口。在本文中,通过引入时段定价程序前后的交通数据,研究了PANYNJ设施的通行费价格与出行需求之间的关系。使用了两种主要方法。首先,利用2000年和2001年4月至8月的月流量数据来计算短期弹性。其次,利用2000年和2002年5月至8月的月流量数据来计算中期弹性。还考虑了数据库的季节性变化通过执行相关的统计测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号