...
【24h】

Beijing Update

机译:北京更新

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This report details information obtained and observations made during an assignment in Beijing between mid-September and the end of November 2007. It updates the report in the November 2006 issue of Transit Australia and the earlier article provides a reference point for the material presented here, namely: the opening of the Beijing Subway Line 5; ticketing and passenger flow improvements; an update on buses and trolleybuses; and future subway expansion. Line 5 opening:The 26.7 km north-south Line 5 opened on 7 October 2007.The line has 23 stations, including four interchange stations (with lines 1,2 and 13) and serves high-density housing developments in the Changping District to the north and the Fengtai District around the southern terminus at Songjiazhuang. The opening of Line 5 brought the route length of the Beijing Subway system to 142 km.
机译:该报告详细介绍了2007年9月中旬至2007年11月底在北京执行任务期间获得的信息和观察到的结果。它更新了《澳大利亚运输杂志》 2006年11月号上的报告,并且较早的文章为此处介绍的材料提供了参考点,即:北京地铁5号线的开通;改善票务和客流;公共汽车和无轨电车的更新;和未来的地铁扩建。 5号线的开通:26.7公里的南北5号线于2007年10月7日开通,该线拥有23个车站,其中包括4个换乘站(分别具有1,2和13号线),为昌平区至高密度住宅开发提供服务。北部和宋家庄南端附近的丰台区。 5号线的启用使北京地铁系统的路线长度达到142公里。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号