...
【24h】

QUEENSLAND

机译:昆士兰州

获取原文
获取原文并翻译 | 示例

摘要

Plans have been released for a new Gabba precinct to include a major public park and a major transport hub linked to the Cross River Rail project. The Woolloongabba Draft Structure Plan follows the announcement that one of four Cross River Rail stations will be located at Wolloongabba. Construction could start on the new precinct as early as 2012. The transport hub will incorporate the existing Woolloongabba bus station. The plan proposes mixed use development of up to 40 storeys above the transport interchange and 20 to 30 maximum storey heights across other parts of the site. Full development of the Woolloongabba area is expected to take 15 to 20 years. It is anticipated that the first site ready for development will be released to the market later next year, after approval of the final Development Scheme in April 2011.
机译:已经发布了新的Gabba辖区计划,其中包括与Cross River Rail项目相关的主要公园和主要交通枢纽。 Woolloongabba草案结构计划草案宣布四个Cross River铁路站之一将位于Wolloongabba。新区可能最早在2012年开始建设。交通枢纽将包括现有的Woolloongabba汽车站。该计划提议在交通交汇处上方开发多达40层的混合用途开发,并在该站点的其他部分建立20到30层的最大高度。 Woolloongabba地区的全面开发预计需要15到20年。在2011年4月的最终开发计划获得批准后,预计第一个准备就绪的开发场地将在明年晚些时候投放市场。

著录项

  • 来源
    《Transit Australia 》 |2010年第10期| p.308310-311313| 共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号