...
【24h】

SOUTH AUSTRALIA

机译:南澳大利亚

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

By 4 May test, trains were running on the Outer Harbor lines and public services recommenced from 9 May.rnMajor upgrade works on the Gawler line began on 6 June with the closure of the line between Adelaide and Mawson Interchange. Works include: upgrading the base layer; installing new gauge-convertible concrete sleepers; improving stormwater drainage; refurbishing/replacing rail; and connecting the new Dry Creek railcar depot to the Gawler line. Letters and brochures detailing the timing of the works, maps and substitute bus timetables were distributed to local residents. Preliminary works took place between 20 and 23 May.
机译:到5月4日测试时,外港线上已经开始运行火车,并从5月9日开始重新启动公共服务。高德勒线上的重大改建工程于6月6日开始,阿德莱德和莫森交汇处之间的线路关闭。作品包括:升级基础层;安装新的可转换轨距的混凝土轨枕;改善雨水排放;翻新/更换滑轨;并将新的Dry Creek铁路车场连接至Gawler线。向当地居民分发了详细说明工程时间,地图和替代公交时刻表的信件和小册子。初步工作于5月20日至23日进行。

著录项

  • 来源
    《Transit Australia》 |2010年第7期|P.207|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号