...
【24h】

QUEENSLAND

机译:昆士兰州

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In a Ministerial reshuffle in late February, Rachel Nolan was promoted from the Transport Minister and the new Minister is Ms Annastacia Palaszczuk.Extra buses, drivers and two new routes were added to the public transport network to service Brisbane River ferry terminals because of flood damage. An extra 269 bus services a week were added to those already in place after the flood. Also two new interim routes have been added. These are a high frequency, peak only Route 233, Apollo Road-Brisbane CBD, and Route 234, Kangaroo Point-Brisbane CBD, running from 31 January until CityCat services return.
机译:在2月下旬的部长改组中,雷切尔·诺兰(Rachel Nolan)从交通部长中晋升,新任部长是安娜斯塔西亚·帕拉斯维克(Annastacia Palaszczuk)女士,由于洪灾,额外的公共汽车,司机和两条新路线被添加到公共交通网络中,以服务布里斯班河渡轮码头。洪水后,已经有269家巴士公司被增加了每周的服务。还添加了两条新的临时路线。这些是从1月31日直到CityCat服务返回的高频,仅峰值的路线,阿波罗路-布里斯班中央商务区233号公路和袋鼠角-布里斯班中央商务区234号公路。

著录项

  • 来源
    《Transit Australia》 |2011年第4期|p.115117|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号