...
首页> 外文期刊>Transit Australia >Sydney Censtructing a Temporary Platform at Thornleigh
【24h】

Sydney Censtructing a Temporary Platform at Thornleigh

机译:悉尼在索恩利建设临时平台

获取原文
获取原文并翻译 | 示例

摘要

Over the long weekend of 9-11 June the Down Platform 3 at Thornleigh was demolished and replaced by a temporary platform. Demolition of the old platform started at daylight on the morning of 9 June and by 1100 the platform was about half removed. A spoil train was provided to remove the demolished material and was running wrong road on the Down line with the locomotives at the Sydney end. When the train was fully loaded it ran into the Down Passing Loop and remained there for most of the daylight hours.
机译:在6月9日至11日的漫长周末,Thornleigh的Down Down 3平台被拆除,并由一个临时平台取代。旧平台的拆除工作于6月9日上午开始进行,到1100年,该平台已拆除约一半。提供了一条弃渣火车,以清除已拆除的物料,并且在悉尼线的机车在Down线的错误道路上行驶。火车满载时,它进入了下行通道,并在大部分白天保持在那里。

著录项

  • 来源
    《Transit Australia 》 |2012年第9期| p.265267| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号