...
【24h】

Transit Newsfile

机译:过境新闻文件

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

On 6 May a tender was issued for construction works on the new Erindale Bus Station, Tenders having been called in October 2014, closing in November, but a suitable bid was not received. The two existing stops and passenger facilities on Comrie Street in Erindale will be upgraded to major stop standards, including new 12 m shelters. Erindale Bus Station will provide increased space for buses, bike racks, comfortable seating sheltered from the elements and real time information. Construction work will involve the installation of a new bus shelter on the west side of the Erindale Shopping Centre and the replacement of the bus stop adjacent to the side of the shops. The new arrangements will be able to accommodate four buses on each side. Seven routes currently service Erindale Centre and the facility will commence the shopping centre's transformation into a new transport hub, better connecting it to other town centres. It will be compatible with plans for future transport improvements including the redirection of additional rapid routes through Erindale.
机译:5月6日,新的Erindale公交车站的建筑工程招标发布,投标人于2014年10月被招标,11月关闭,但未收到合适的投标。 Erindale的Comrie Street上现有的两个车站和乘客设施将升级为主要车站标准,包括新的12 m庇护所。 Erindale巴士站将为公共汽车,自行车架,舒适的座椅(不受要素和实时信息遮挡)提供更多的空间。建设工作将包括在Erindale购物中心西侧安装一个新的公交候车亭,并更换商店附近的公交车站。新的安排将能够在每侧容纳四辆公共汽车。目前有7条路线为Erindale中心提供服务,该设施将开始将购物中心改造成新的交通枢纽,从而更好地将其与其他镇中心连接起来。它将与未来的交通改善计划兼容,包括重定向通过爱林代尔的其他快速路线。

著录项

  • 来源
    《Transit Australia》 |2015年第7期|210-221|共12页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号