【24h】

Transit Newsfile

机译:过境新闻文件

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

On 28 April the National Capital Authority and the ACT Environment and Planning Directorate gave planning approval for the line. Work can proceed as soon as the contracts are finalised. The Capital Metro Agency and NCA have developed solutions to improve access along Swinden and Antill Streets in Downer and Dickson. These changes include an extra entry point into Swinden Street from Northbourne Avenue, as well as improvements to the entry point off Antill Street by widening the road to allow safer access for motorists. The approved works also include other changes to traffic arrangements along the corridor, including removal of a right hand turn on Rudd Street off Northbourne Avenue, and a number of new signalised intersections along Northbourne Avenue.
机译:4月28日,国家首都管理局和ACT环境与规划局批准了该生产线的规划批准。合同定案后即可立即进行工作。首都地铁局和NCA已经开发了解决方案,以改善唐纳和迪克森的Swinden和Antill街的交通。这些变化包括从Northbourne Avenue到Swinden Street的额外入口,以及通过加宽道路以允许驾车者更安全地进入Antill Street的入口。批准的工程还包括对走廊交通安排的其他更改,包括拆除Northbourne Avenue旁Rudd Street的右转弯,以及Northbourne Avenue沿线的许多新信号交叉口。

著录项

  • 来源
    《Transit Australia》 |2016年第7期|206-207210-219|共12页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号