...
首页> 外文期刊>Town planning review >Delivering the planning system in England: Skills' capacity constraints
【24h】

Delivering the planning system in England: Skills' capacity constraints

机译:在英格兰交付计划系统:技能的能力限制

获取原文
获取原文并翻译 | 示例
           

摘要

The planning system in England has recently undergone revision. At the same time local planning authorities are being required to implement new government initiatives, reviews and recently enacted EU legislation. All these changes are bringing in new ways of working for local authorities and sending the English planning system into a period of flux. Drawing on recent research the authors consider whether there is the capacity in terms of skills within local planning authorities in England for them to deliver the outcomes required by these changes.
机译:英格兰的规划系统最近进行了修订。同时,要求地方规划部门实施新的政府计划,审查和最近颁布的欧盟立法。所有这些变化为地方当局带来了新的工作方式,并使英语计划体系进入了一个动荡的时期。作者根据最近的研究,考虑了英格兰地方规划机构内部是否具备根据这些技能提供所需成果的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号