首页> 外文期刊>Thermal engineering >Comprehensive Assessment of the Effective Scope of Modernization of Thermal Power Plants to Substantiate the Rational Structure of the Generating Capacities for the Future until 2035
【24h】

Comprehensive Assessment of the Effective Scope of Modernization of Thermal Power Plants to Substantiate the Rational Structure of the Generating Capacities for the Future until 2035

机译:综合评估火力发电厂现代化的有效范围,以证实直到2035年未来发电量的合理结构

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The article deals with issues of technical and economic substantiation of priorities and scopes of modernizing the existing thermal power plants (TPPs) in Russia to work out long-term forecasts of the development of the industry. The current situation in the TPP modernization trends is analyzed. The updated initial figures of the capital and operation costs are presented and the obtained estimates of the comparative effi-ciency'of various investment decisions on modernization and equipment replacement at gas-and-oil-burning and coal-fired TPPs with regard to the main zones of the national Unified Power System (UPS) of Russia are cited. The results of optimization of the generating capacity structure underlie a study of alternative TPP modernization strategies that differ in the scope of switching to new technologies, capital intensity, and energy efficiency (decrease in the average heat rate). To provide an integral economic assessment of the above strategies, the authors modified the traditional approach based on determination of the overall discounted costs of power supply (least-cost planning) supplemented with a comparison by the weighted average wholesale price of the electricity. A method for prediction of the wholesale price is proposed reasoning from the direct and dual solutions of the optimization problem. The method can be adapted to various combinations of the mechanisms of payment for the electricity and the capacity on the basis of marginal and average costs. Energy and economic analysis showed that the opposite effects of reduction in the capital investment and fuel saving change in a nonlinear way as the scope of the switch to more advanced power generation technologies at the TPPs increases. As a consequence, a strategy for modernization of the existing power plants rational with respect to total costs of the power supply and wholesale electricity prices has been formulated. The strategy combines decisions on upgrade and replacement of the equipment at the existing power plants of various types. The basic parameters of the strategy for the future until 2035 are provided.
机译:本文讨论了在俄罗斯对现有火力发电厂(TPP)进行现代化改造的优先事项和范围的技术和经济依据,以制定对该行业发展的长期预测。分析了TPP现代化趋势的现状。列出了更新后的资本和运营成本的初始数字,以及获得的各种投资决策在天然气和燃油,燃煤TPP的现代化和设备更换方面的相对效率的估算,引用了俄罗斯国家统一电力系统(UPS)的区域。优化发电能力结构的结果是对替代性TPP现代化策略的研究的基础,这些策略在转换到新技术的范围,资金强度和能源效率(平均发热量的降低)方面有所不同。为了对上述策略进行整体的经济评估,作者对传统方法进行了修改,以确定总的供电折扣成本(最低成本计划)为基础,并辅以加权平均批发电价进行比较。从优化问题的直接和对偶解出发,提出了一种批发价格的预测方​​法。该方法可以基于边际成本和平均成本而适应于电力的支付机制和容量的各种组合。能源和经济分析表明,随着TPP转换为更先进的发电技术的范围不断扩大,减少资本投资和节省燃料的相反效果将以非线性方式变化。结果,已经制定了在电力供应的总成本和批发电价方面合理化现有发电厂的战略。该策略结合了各种类型现有电厂的设备升级和更换决策。提供了到2035年的未来战略的基本参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号