首页> 外文期刊>The Railway Magazine >Let's call time on funding WCML upgrade
【24h】

Let's call time on funding WCML upgrade

机译:让我们花些时间为WCML升级提供资金

获取原文
获取原文并翻译 | 示例
       

摘要

The DfT's Rail Review should make everyone think what exactly the railways are there for. Clearly, costs have got out of control. We can debate who is to blame, but the important thing now is to consider what we want our railways to do and what can be done to slash costs - an urgent and necessary first step. Network Rail has made progress in reducing delays and cutting costs. There is much more to do on cutting the causes of costs by a comprehensive standards review. So what is left to save? The biggest element of cost is still the West Coast Main Line. NR costs may be down from £15bn to £9bn but if a few more billion could be saved, perhaps some could be spent more equitably across the network.
机译:DfT的《铁路审查》应该使每个人都思考铁路的确切用途。显然,成本已失控。我们可以辩论应该归咎于谁,但是现在重要的是考虑我们希望我们的铁路做什么以及可以采取哪些措施来削减成本-这是紧急而必要的第一步。 Network Rail在减少延迟和削减成本方面取得了进展。通过全面的标准审查,在削减成本原因方面还有很多工作要做。那么还剩下什么呢?成本的最大因素仍然是西海岸干线。 NR成本可能从150亿英镑下降到90亿英镑,但如果可以节省数十亿美元,也许可以更公平地在整个网络上花费一些。

著录项

  • 来源
    《The Railway Magazine》 |2004年第1236期|p.48|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 铁路运输;
  • 关键词

  • 入库时间 2022-08-18 01:38:20

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号