...
首页> 外文期刊>Railway magazine >Track work at EOR's North Weald
【24h】

Track work at EOR's North Weald

机译:跟踪EOR的North Weald的工作

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Epping Ongar Railway, closed for upgrading, has lifted the track through North Weald station and reduced the formation to its original height. Salvaged ballast is being cleaned for relaying. The North Weald station building has been receivingrnattention with a 1950s addition now demolished and the interior being refurbished.rnThe westbound platform is being repaired and extended, using original pre-cast components as patterns to ensure uniformity with its 1950s prefabricated appearance.
机译:停业进行升级的埃平·翁加铁路(Epping Ongar Railway)已将铁路穿过北韦尔德(North Weald)站,并将地层降至其原来的高度。正在清理打捞的镇流器以中继。 North Weald车站大楼一直受到关注,1950年代的扩建现已拆除,内部进行了翻新。rn西行平台正在维修和扩建中,使用原始的预制构件作为图案,以确保其1950年代预制结构的均匀性。

著录项

  • 来源
    《Railway magazine》 |2009年第1303期|71-71|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号