首页> 外文期刊>The Railway Magazine >Talyllyn prepares for 60th anniversary year
【24h】

Talyllyn prepares for 60th anniversary year

机译:Talyllyn为成立60周年做准备

获取原文
获取原文并翻译 | 示例
           

摘要

Attention is turning to two more Talyllyn Railway locos as 1865-built Fletcher Jennings 0-4-0WT Dolgoch approaches completion after overhaul. Work has included fitting the new boiler, built by the Severn Valley Railway and dispatched from Bridgnorth on March 24, ready for its return to service on May 14 in the TR's 60th anniversary year. Fitted with new tyres, the wheels of Barclay 0-4-OWT No. 6 Douglas have been pressed onto new axles. The axleboxes have been machined and the overhaul is now being completed. Barclay/TR 0-4-2T No. 7 Tom Rolt has received attention to its piston valves.
机译:随着1865年建造的弗莱彻·詹宁斯(Fletcher Jennings)0-4-0WT Dolgoch在大修后接近完工时,注意力又转移到Talyllyn铁路火车上。工作包括安装由Severn Valley Railway建造并于3月24日从Bridgnorth派出的新锅炉,准备在TR成立60周年的5月14日重新投入使用。装有新轮胎的巴克莱0-4-OWT 6号道格拉斯(Douglas)车轮已压在新轴上。轴箱已加工完毕,大修现已完成。 Barclay / TR 0-4-2T No. 7 Tom Rolt的活塞阀受到关注。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1322期|p.89|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号