首页> 外文期刊>The Railway Magazine >Nework Rail gets cold shoulder as Transport Scotland branches out
【24h】

Nework Rail gets cold shoulder as Transport Scotland branches out

机译:随着运输苏格兰分公司的发展,铁路网变得冷漠

获取原文
获取原文并翻译 | 示例
       

摘要

Transport Scotland's Bill Reeve described to the All Party Parliamentary Rail Group how a new 35-mile railway was to be built without the involvement of Network Rail, apart from a connection agreement at one end. Transport Scotland has reopened a number of lines, including Airdrie-Bathgate and Stirling-Alloa, but this is the first time it is doing so on its own. The new line runs between Newcraighall, near Edinburgh, and Tweedbank, in the Scottish Borders, and has more than 100 structures. It is to be built largely on an existing double track formation, although this time it will be a mixture of single and double track with dynamic loops to enable a half-hourly passenger service.
机译:苏格兰交通运输局局长比尔·里夫(Bill Reeve)向全党议会铁路组织介绍了如何在不涉及网络铁路的情况下建造一条新的35英里铁路,除了一端达成了连接协议。苏格兰交通运输公司已经重新开放了许多线路,包括Airdrie-Bathgate和Stirling-Alloa,但这是它第一次自行这样做。这条新线在爱丁堡附近的纽克拉格豪尔(Newcraighall)和苏格兰边界的特威德班克(Tweedbank)之间运行,有100多个结构。它将主要建立在现有的双轨编队上,尽管这次它将是单轨和双轨的结合,并带有动态环路以实现半小时的客运服务。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1318期|p.14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:31:05

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号