首页> 外文期刊>The Railway Magazine >HS1 and HS2 will be physically joined
【24h】

HS1 and HS2 will be physically joined

机译:HS1和HS2将物理连接

获取原文
获取原文并翻译 | 示例
       

摘要

The 'will it, won't it?' saga of High Speed 2 has finally been resolved with a Government decision to physically link the projected new line with the existing High Speed 1. Under the previous Labour Government, one of the plans was to provide HS2 with its own terminus at Euston with no physical connection, but now joined-up thinking has won the day and a way has been found to enable through running from Paris to the North-West of England by linking the lines in the Old Oak Common area.
机译:“会,不是吗?”政府决定将预计的新生产线与现有的高速1进行物理连接,最终解决了“高速2”的传奇问题。在上届工党政府的计划下,其中一项计划是在不具任何物理性的Euston为其提供HS2终点站连接,但现在联合思维已经赢得了人们的青睐,并且找到了一种方法,可以通过将Old Oak Common地区的线路连接起来而实现从巴黎到英格兰西北的穿越。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1318期|p.6-7|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:31:04

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号