首页> 外文期刊>The Railway Magazine >Foxclears Kirklees snow
【24h】

Foxclears Kirklees snow

机译:Foxclears Kirklees雪

获取原文
获取原文并翻译 | 示例
           

摘要

The 15in gauge Kirklees Light Railway's 2-6-2T Fox was more than equal to the 10 to 14 inches of snow that greeted the railway on December 1. Fox was steamed anticipating working'Santa Specials'for schoolchildren but the snowfall prevented them getting to Clayton West. Snow-ploughing duties at Kirklees are normally undertaken by 4wD Jay, but having Fox in steam was too good an opportunity to miss. The 1987-built loco had the adhesion to punch through the biggest drifts and by the time the ploughing team reached Shelley, the banks of snow beside the line were higher than the loco's side tanks.
机译:15英寸长的Kirklees轻轨铁路公司的2-6-2T福克斯(Fox)大于12月1日迎接铁路的10至14英寸的降雪量。福克斯因蒸蒸日上而期待为学童工作的“圣塔特价”活动,但降雪使他们无法上学。西克莱顿。 Kirklees的扫雪任务通常由4wD Jay负责,但是让Fox忙碌是一个错过的好机会。 1987年建造的机车具有附着力,可以冲过最大的漂移,当耕犁队到达雪莱时,生产线旁边的积雪比机车的侧面储油罐高。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1318期|p.78|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号