首页> 外文期刊>The Railway Magazine >Pacifics under repair at Crewe
【24h】

Pacifics under repair at Crewe

机译:克鲁郡正在维修的太平洋地区

获取原文
获取原文并翻译 | 示例
       

摘要

The light test run of BR Standard Pacific No. 70000 Britannia took place on November 9 between Crewe, Warrington and Carnforth with a support coach plus a West Coast Class 47 diesel in case of failure. The loaded test run was postponed to December 1 due to a piston gland requiring repacking. This run was cancelled at the last minute after the engine had been in steam at Carnforth following piston gland packing remedial work. It is understood to have been cancelled with the engine returning to Crewe (as booked) in the evening of December 1 to fit an air-braking system, so that the loco will be dual-braked when it finally emerges in the spring.
机译:11月9日,在克鲁,沃灵顿和卡恩福思之间进行了BR Standard Pacific No. 70000 Britannia的轻型试验,试验过程中由支持教练加上西海岸47类柴油机进行了故障测试。由于活塞密封套需要重新包装,加载的测试运行被推迟到12月1日。在活塞密封填料修补工作之后,发动机在Carnforth处于蒸汽状态后的最后一分钟,该运行被取消。据了解,该发动机已取消,因为发动机于12月1日晚上返回克鲁(预订)以安装空气制动系统,因此机车在春季最终出现时将被双制动。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1318期|p.67|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:31:06

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号