首页> 外文期刊>The Railway Magazine >6412 is making progress after qettinq the nod over 1420
【24h】

6412 is making progress after qettinq the nod over 1420

机译:在1420年qettinq点头之后6412正在取得进展

获取原文
获取原文并翻译 | 示例
       

摘要

Significant progress has been made on repairs to the boiler of the South Devon Railway's Pannier No. 6412, including major plate replacement. Following the SDR's acquisition of R.K. Pridham Engineering (RM Nov), staff are working on the boiler pending completion of a new boiler shop. Pannier No. 6412 was purchased from the WSRA in late-2008 in largely 'kit of parts' condition. Work on the loco's frames has started at Buckfastleigh as a volunteer project and the wheels have been reprofiled. The Pannier was projected to be completed in early 2012 but with progress going so well, it could appear in steam before the end of 2011.
机译:南德文郡铁路公司第6412号Pannier锅炉的维修工作取得了重大进展,包括更换了主要的钢板。特别提款权收购R.K. Pridham Engineering(11月RM),工作人员正在锅炉上,直到新的锅炉车间完工。 Pannier 6412号是在2008年底从WSRA购买的,基本上是“零件包”状态。作为志愿者项目,机车车架的工作已在Buckfastleigh开始,车轮已重新配置。 Pannier计划于2012年初完成,但进展非常顺利,它可能会在2011年底之前出现。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1318期|p.61|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:31:06

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号