首页> 外文期刊>Nuclear fuel cycle monitor >PROGRESS GETS STATE NOD FOR TWO NEW NUKES IN FL
【24h】

PROGRESS GETS STATE NOD FOR TWO NEW NUKES IN FL

机译:佛罗里达州的两个新NUTES取得进展

获取原文
获取原文并翻译 | 示例
           

摘要

The Florida Public Service Commission last week backed Progress Energy Florida's plans for two new nuclear reactors at a greenfield site in Levy County, Fla., making Progress the second company to receive a positive need determination from the Commission this year. Florida Power and Light received a similar determination from the PSC in March (NFC Monitor, Vol. 27 No. 13). "The new units are projected to satisfy the generation needs of Progress through 2023 while emitting zero greenhouse gases and reducing Florida's dependence on natural gas and fuel oil," the PSC noted in a statement after its ruling.
机译:佛罗里达州公共服务委员会上周支持了进步能源佛罗里达州在佛罗里达州利维县的一个绿地上建造两座新核反应堆的计划,这使进步公司成为今年获得委员会肯定需求确定的第二家公司。 Florida Power and Light于3月份从PSC收到了类似的裁定(NFC Monitor,第27卷第13期)。 PSC在裁定后的一份声明中指出:“新装置预计将满足2023年Progress的发电需求,同时排放零温室气体,并减少佛罗里达州对天然气和燃油的依赖。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号