首页> 外文期刊>The Railway Magazine >'Patriot'tender rebuild starts at Barry
【24h】

'Patriot'tender rebuild starts at Barry

机译:爱国者招标在巴里开始重建

获取原文
获取原文并翻译 | 示例
       

摘要

Concurrent with the LMS-Patriot Project announcing that L&NWR Heritage Ltd, Crewe, is the'preferred builder'of the boiler for its 'Patriot' No. 45551 The Unknown Warrior (RM Jan), dismantling of a Fowler tender, intended for use with the loco, began at Barry. It is thought to have originally entered Barry scrapyard behind LMS'Crab'No. 42765). Initial work, by Cambrian Transport Ltd, involves removal of the badly-corroded tank. A Patriot Project member has pledged a'significant' sum towards the cost of manufacturing a new tank. The condition of the tender frames will then be assessed. New axlebox castings will be produced using a pattern already held at the Avon Valley Railway. Other progress towards construction of the loco includes fabrication of smoke deflectors, while the bogie bolster casting arrived at Llangollen in November for fitting to the loco frames.
机译:与LMS-Patriot项目同时宣布,L&NWR Heritage Ltd,Crewe是其“ Patriot”号45551 The Unknown Warrior(RM Jan)的锅炉的“首选制造商”,该产品拆除了Fowler招标,意在与机车始于巴里。据认为最初是进入LMS'Crab'No号后面的Barry废品场。 42765)。寒武纪运输有限公司的最初工作是拆除腐蚀严重的储罐。爱国者计划的一个成员已经承诺了一笔“可观的”款项,用于制造新的坦克。然后将评估招标框架的状况。新的轴箱铸件将使用雅芳谷铁路公司已经采用的模式生产。机车建造方面的其他进展包括制造烟雾导流板,而转向架支撑铸件于11月到达Llangollen以适合机车框架。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1318期|p.61|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:31:06

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号