...
首页> 外文期刊>The Railway Magazine >Steam Works designs for redeveloped Bridqnorth
【24h】

Steam Works designs for redeveloped Bridqnorth

机译:Steam Works为重新开发的Bridqnorth设计

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Ground investigation works at Bridgnorth started in January as proposals for the SteamWorks visitor attraction are developed. Major redevelopment at Bridgnorth (RM May 2012) is a top priority for funding linked to the Severn Valley Railway's share issue launched last October. Ground-condition tests will help detail the location of buildings and foundation design. The SVR board has not yet approved expenditure on any specific SteamWorks project, but has given the go-ahead for the design of new buildings, development of a station conservation plan, and preparation of a business plan proving the sustainability of the proposals.This material will support bids for funding and an application for planning approval to be submitted in the spring.
机译:随着针对SteamWorks游客吸引力的建议的开发,布里奇诺斯(Bridgnorth)的地面调查工作于1月开始。 Bridgnorth的大型改建(2012年5月RM)是与去年10月启动的Severn Valley Railway发行股票有关的资金的最高优先事项。地面条件测试将有助于详细说明建筑物的位置和基础设计。 SVR董事会尚未批准任何Steam工程项目的支出,但已批准了新建筑的设计,车站保护计划的制定以及业务计划的编制,以证明提案的可持续性。将在春季支持资金招标和计划批准申请。

著录项

  • 来源
    《The Railway Magazine》 |2013年第1344期|66-66|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号