首页> 外文期刊>The Railway Magazine >Earth slip hits Spa Valley Railway
【24h】

Earth slip hits Spa Valley Railway

机译:泥石流击中了温泉谷铁路

获取原文
获取原文并翻译 | 示例
           

摘要

The Spa Valley Railway became the latest heritage railway victim of an embankment slip following land movement on November 9. The incident occurred close to the railway's Tunbridge Wells West station following a prolonged period of heavy rain. The slip covers an area of more than 100ft and requires substantial repairs before any trains can operate over the adjacent line. Following assessment by civil engineers, it has been agreed that the running line will be slewed onto land currently used as sidings, which will allow trains during the Santa season to operate on the alternate line. Until the. repairs are completed in 2013, this will give 'rare track' opportunities, including the first use of the A26 Eridge Road bridge southern span for passenger services since 1985.
机译:继11月9日土地移动之后,斯帕谷铁路成为路堤滑坡的最新遗产铁路受害者。该事件在长时间的大雨之后发生在铁路的Tunbridge Wells West站附近。滑道覆盖的面积超过100英尺,在任何列车可以通过相邻线路运行之前,都需要进行大量修理。经过土木工程师的评估,已经同意将运行线路转弯到当前用作壁板的土地上,这将使圣诞老人季节的火车可以在备用线路上运行。直到。维修工作将于2013年完成,这将提供“难得的机会”,包括自1985年以来首次使用A26 Eridge Road桥向南延伸以提供客运服务。

著录项

  • 来源
    《The Railway Magazine》 |2013年第1341期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号