首页> 外文期刊>The Railway Magazine >Railways in Parliament
【24h】

Railways in Parliament

机译:国会铁路

获取原文
获取原文并翻译 | 示例
       

摘要

Peter Kyle (Hove & Portslade) asked the Secretary of State forTransport, with reference to the summer Budget, if he will publish his department's original feasibility study on Brighton Main Line 2 and if he will provide the timescale for the extended Lewes to Uckfield study looking at improving rail links between London and the South Coast. Transport Minister Claire Perry replied: "The original feasibility study was undertaken in 2008 and focused on the reinstatement of the Lewes to Uckfield line - specifically the costs of an un-electrified, single track railway. "The department anticipates securing external consultancy support for this work during the early autumn, with the findings of the study being provided to ministers by the end of 2015."
机译:彼得·凯尔(Hove&Portslade)询问运输国务大臣,是否参考夏季预算,是否会在布莱顿干线2号线发布其部门的原始可行性研究,是否会提供将刘易斯扩展至乌克菲尔德研究的时间表?改善伦敦和南海岸之间的铁路连接。运输部长克莱尔·佩里(Claire Perry)回答:“最初的可行性研究于2008年进行,重点是恢复刘易斯至乌克菲尔德线-特别是未电气化的单轨铁路的成本。”运输部希望为此获得外部咨询支持。这项工作是在初秋进行的,研究结果将于2015年底提供给部长们。”

著录项

  • 来源
    《The Railway Magazine》 |2015年第1373期|16-16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:27:11

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号