首页> 外文期刊>The Railway Magazine >Vossloh-Kiepe begins Anglia Mk 3 work
【24h】

Vossloh-Kiepe begins Anglia Mk 3 work

机译:Vossloh-Kiepe开始进行Anglia Mk 3工作

获取原文
获取原文并翻译 | 示例
       

摘要

Vossloh Kiepe has started the Mk 3 'refresh' project that will be carried out at Abellio Greater Anglia's Norwich Crown Point depot. The work involves a full strip-out of the carriage, which will then be rebuilt with new carpets and tables, LED lighting, and at-seat power sockets. Also included will be the fitting of controlled-emission toilets to replace the old style that discharges waste onto the track. This is the topic of an ongoing campaign by the RMT rail union to move to retention tanks. Completion of the refurbishment is set for October 2016, just as the Abellio franchise is due to end.
机译:Vossloh Kiepe已启动Mk 3“刷新”项目,该项目将在Abellio Greater Anglia的Norwich Crown Point仓库进行。这项工作包括将滑架完全剥掉,然后将其重新铺上新的地毯和桌子,LED照明灯和座椅上的电源插座。还包括控制排放厕所的装置,以取代将废物排放到赛道上的旧式厕所。这是RMT铁路工会正在进行的一项运动的主题,即要转移到储油罐。翻新工程定于2016年10月完成,而Abellio的专营权也将到期。

著录项

  • 来源
    《The Railway Magazine》 |2015年第1367期|74-74|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:26:57

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号