首页> 外文期刊>The Railway Magazine >Network Track Record
【24h】

Network Track Record

机译:网络跟踪记录

获取原文
获取原文并翻译 | 示例
       

摘要

FURTHER consultation has taken place into the viability of reopening the Bristol to Portishead line to passengers. Costs for the first phase of the project have almost trebled, from £58million to between f 145m and £175m, putting the proposed half-hourly service beyond reach. The new consultation sought feedback about an hourly service - known as MetroWest Phase 1 - using a scaled-back version of the proposed infrastructure, but still serving two new stations at Pill and Portishead. Around five miles of the route is already used by freight trains to Portbury Docks, and would need only minor modifications, but the remaining section requires more extensive rebuilding.
机译:关于向乘客重新开放布里斯托尔至波蒂斯黑德专线的可行性,我们进行了进一步的咨询。该项目第一阶段的成本几乎翻了三倍,从5800万英镑增至1.45亿至1.75亿英镑,这使得建议的半小时服务超出了预期范围。新的咨询旨在使用按比例缩减的拟议基础设施,提供每小时服务(称为MetroWest第一阶段)的反馈,但仍为Pill和Portishead的两个新站点提供服务。到波特伯里码头的货运火车已经使用了这条路线的大约五英里,并且只需要进行很小的修改,但是其余部分则需要进行更广泛的重建。

著录项

  • 来源
    《The Railway Magazine》 |2018年第1402期|76-77|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:24:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号