首页> 外文期刊>The Railway Magazine >TPE set 'public target' for performance recovery
【24h】

TPE set 'public target' for performance recovery

机译:TPE为绩效恢复设定“公共目标”

获取原文
获取原文并翻译 | 示例
       

摘要

TRANSPENNINE Express (TPE) has been set a "public target" for its performance recovery by Transport for the North (TfN). This follows months of poor performance and the temporary cancellation of a number of services from the December 2019 timetable change. The move has been agreed by leaders across the North, and follows what TfN says was "a period late last year when TPE returned the worst performance figures in the country, sometimes with less than half their services meeting basic performance targets".
机译:TRANSPENNINE Express(TPE)已被北方运输(TfN)设定为其性能恢复的“公共目标”。这是由于几个月以来表现不佳以及自2019年12月时间表更改以来暂时取消了一些服务。 TfN表示,此举已得到北方领导人的​​同意,这是TfN所说的“去年下半年,TPE返回了该国最差的绩效数据,有时其服务的一半还不到基本绩效目标”。

著录项

  • 来源
    《The Railway Magazine》 |2020年第1428期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 05:20:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号