Dounreay's AMRR - an alliance challenge

机译:Dounreay的AMRR-联盟挑战

获取原文
获取原文并翻译 | 示例
       

摘要

Following the NII SEPA audit in 1998, UKAEA at Dounreay developed an integrated decommissioning and waste management plan. This set out all the tasks necessary to decommission and restore the site. This programme covered decommissioning all the facilities, treating all the wastes including the residual fuel, which had been left as a result of the fast reactor development programme. It also showed that new plants and infrastructure were needed to allow all aspects of this work to be completed. After discussion with the funding arm of Government and the regulators, a programme of between 50 and 60 years was agreed with all the major hazards removed in the first 25 years.
机译:在1998年NII SEPA审核之后,UKAEA在Dounreay制定了综合的退役和废物管理计划。这列出了停用和恢复站点所需的所有任务。该计划涵盖所有设施的退役,处理所有由于快速反应堆开发计划而留下的废物,包括剩余燃料。它也表明需要新的工厂和基础设施来完成这项工作的所有方面。在与政府和监管机构的资金部门进行讨论之后,商定了一个50至60年的计划,并消除了前25年的所有主要危害。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号