首页> 外文期刊>The NEWEA journal >Addressing the Achilles' heel of an aging collection system
【24h】

Addressing the Achilles' heel of an aging collection system

机译:解决老化收集系统的致命弱点

获取原文
获取原文并翻译 | 示例
           

摘要

After experiencing two back-to-back costly infrastructure catastrophes, the Warwick Sewer Authority (WSA) could not endure another. Knowing that its main influent pipe, which runs beneath Interstate Route 95 (1-95), was showing signs of age, WSA put its rehabilitation on the high-priority list. Although it took years to complete the project, WSA persevered and completed the job in 2015. This article tells the story of this project, including lessons learned, with the hope that other water utilities will choose the same proactive approach and avoid the financial and operational pains endured by WSA as a result of previous critical infrastructure failures.
机译:在经历了两次背对背昂贵的基础设施灾难之后,沃里克下水道管理局(WSA)无法忍受另一场灾难。 WSA知道其主要进水管在95号州际公路(1-95)下运行,并且已显示出老化迹象,因此将其修复列为优先事项。尽管完成该项目花费了数年时间,但WSA坚持不懈并在2015年完成了工作。本文讲述了该项目的故事,包括所汲取的经验教训,希望其他自来水公司将选择相同的积极方法,避免财务和运营由于先前的关键基础架构故障,WSA承受了痛苦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号