首页> 外文期刊>The Naval Architect >Fincantieri launches ASW corvette, builds patrol vessels for UAE Navy
【24h】

Fincantieri launches ASW corvette, builds patrol vessels for UAE Navy

机译:Fincantieri发射ASW护卫舰,为阿联酋海军建造巡逻舰

获取原文
获取原文并翻译 | 示例
       

摘要

Delivery of the vessel to the UAE Navy is expected to take place towards the end of the year. The corvette was ordered in July 2009 under a contract that includes an option for a second vessel which has not yet been finalized. Fincantieri is responsible for all aspects of the project except for the combat system, which is supplied by the UAE Navy as Government Furnished Equipment (GFE). Construction of Abu Dhabi commenced in October 2009. The keel is believed to have been laid down in December 2009.
机译:该船预计将在今年年底交付给阿联酋海军。该护卫舰是2009年7月根据一项合同订购的,该合同包括一项尚未定案的第二艘船的选择权。 Fincantieri负责该项目的所有方面,战斗系统除外,该系统由阿联酋海军作为政府装备(GFE)提供。阿布扎比的建造工作于2009年10月开始。据信龙骨已于2009年12月铺设。

著录项

  • 来源
    《The Naval Architect》 |2011年第1期|p.2628|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号