...
首页> 外文期刊>The Naval Architect >QE class assembly gets under way
【24h】

QE class assembly gets under way

机译:量化宽松课程开始

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of the UK Royal Navy's first CVF carrier took an important step forward recently when the massive crane, Goliath, swung into action for the first time, signalling the start of the assembly phase of the vessel.After months of planning and preparation the first section of Central Block 03, built by A&P Tyne and transported to Rosyth just a few weeks earlier, was secured to the cranes lifting gear. Goliath then gently lifted the 800tonne section from the ground, smoothly hoisted it up and eased it into place on top of Lower Block 03, starting a new chapter in the construction of the carriers.
机译:英国皇家海军的第一艘CVF航母的建造向前迈出了重要的一步,大型起重机Goliath首次投入使用,这标志着该船组装阶段的开始。由A&P Tyne建造并仅在几周前运往Rosyth的Central Block 03的固定装置已固定在起重机的起重装置上。然后,Goliath轻轻地将800吨重的部分从地面抬起,平稳地将其吊起,并将其放到03号低座舱的顶部,从而开始了航母建造的新篇章。

著录项

  • 来源
    《The Naval Architect》 |2012年第maraappa期|p.19-21|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号