首页> 外文期刊>The Naval Architect >Waertsilae inaugurates new Trieste facilities
【24h】

Waertsilae inaugurates new Trieste facilities

机译:Waertsilae开设的里雅斯特新工厂开业

获取原文
获取原文并翻译 | 示例
       

摘要

Wartsila has inaugurated new modern facilities for the Delivery Centre Trieste and adopted a new manufacturing concept to boost capacity and flexibility.Waertsilae said it had invested €18 million in its Italian manufacturing, assembly, and testing plant. The new engine production facilities and new Waertsilae Land & Sea Academy Training Centre were inaugurated in September in the presence of the Finnish ambassador in Italy, Pauli Maekelae, Waertsilae's president, Ole Johansson, and Waertsilae management. The company said the investment would raise the capacity of Delivery Centre Trieste to a level that would meet future market requirements and flexibility needs and that supported its growth targets.
机译:瓦锡兰(Wartsila)为Trieste交付中心启用了新的现代化设施,并采用了新的制造理念以提高产能和灵活性.Waertsilae表示已在其意大利制造,组装和测试工厂投资1800万欧元。新的发动机生产设施和新的Waertsilae陆地与海洋学院培训中心于9月举行落成典礼,芬兰驻意大利大使,Paula Maekelae,Waertsilae总裁,Ole Johansson和Waertsilae管理层出席了会议。该公司表示,这项投资将把Trieste交付中心的容量提高到可以满足未来市场需求和灵活性需求并支持其增长目标的水平。

著录项

  • 来源
    《The Naval Architect》 |2007年第sup期|20|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号