COMMISSIONING A MICROGRID

机译:调试微电网

获取原文
获取原文并翻译 | 示例
           

摘要

At Marine Corps Air Ground Combat Center, Twentynine Palms, Calif., the mission must be supported through any disruption in electric power. Additionally, Marines and civilians on base must be protected from intense heat in the desert environment that can reach up to 127°-F. Commissioning is a critical step in acceptance and implementation of any major system to ensure it meets the user and enterprise needs.In late March, Twentynine Palms performed initial testing of direct transition microgrid controls programming. The base installed SEL 2411 fast load shed controllers in order to provide a direct access control for load shedding. These controllers are being used along withbreaker status, voltage, and frequency trip points to identify a loss of power event.Previous testing occurred at night without photovoltaic. The testing that directly opened the breakers manually transitioned well, but when power was cut to the base from Southern California Edison, it was found that the time lag from reactions on the breakers did not trip fast enough. This caused a trip on the turbines form under frequency.
机译:在海军陆战队空军战斗中心,加利福尼亚州的二核棕榈树。,必须通过任何电力中断支持任务。此外,必须保护船尾的海军陆战队和平民免受可达到127°-f的沙漠环境中的强烈热量。调试是接受和实施任何主要系统的关键步骤,以确保其符合用户和企业需求。3月下旬,Twentynine Palms执行了直接过渡微电网编程的初始测试。基座安装了SEL 2411快速载波控制器,以便为负载脱落提供直接访问控制。这些控制器正在使用断路器状态,电压和频率跳频点以识别电源事件的丢失。以前的测试发生在没有光伏的夜间。直接打开断路器的测试手动过渡,但是当电力从南加州爱迪生切割到基地时,发现断路器反应的时间滞后不够快。这导致频率下的涡轮机的行程。

著录项

  • 来源
    《Military engineer》 |2021年第733期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号