...
首页> 外文期刊>Military engineer >Fueling an Expanded Mission
【24h】

Fueling an Expanded Mission

机译:推动扩大的使命

获取原文
获取原文并翻译 | 示例
           

摘要

Pittsburgh Air Reserve Station is home to Air Force Reserve Command's 911th Airlift Wing, which provides tactical airlift support for equipment, aeromedical evacuation, and agile combat support. To accommodate a mission change from a C-130 airframe to the more versatile C-17 cargo aircraft, the base required a new Type Ⅲ Hydrant Fueling System to be commissioned. Additional supporting work included expansions and upgrades to the apron, maintenance facilities, and fueling systems. Overall, the project will help dramatically enhance capacity to deliver troops and essential equipment where needed. To expedite these changes required several additional infrastructure improvements, including a new pumphouse, the integration of updates within the existing system, an overhaul of the current controls system, and the addition of a new 5-Mbbl tank. With work beginning during the early stages of the coronavirus, restrictions put in place posed unique challenges. Delaying the commissioning until heightened health and safety protocols were lifted was not an option. So in May 2020, a team from Pond navigated the intense travel constraints, evolving procedures, and social distancing guidelines to carry out the crucial upgrades.
机译:匹兹堡空气储备火车站是空军储备命令的第911次空运翼的所在地,为设备,航空医疗疏散和敏捷战斗支持提供了战术空运支持。为了容纳从C-130机身的特派团变更到更通用的C-17货物飞机,底座需要一种新型Ⅲ型消防栓系统委托。额外的支持工作包括扩展和升级到围裙,维护设施和加油系统。总体而言,该项目将有助于大大提高提供需要的部队和必要设备的能力。为了加快这些变化,需要几种额外的基础设施改进,包括新的散栅,在现有系统中的更新集成,大修目前的控制系统,以及添加新的5-MBBL箱。在冠状病毒的早期阶段开始工作,限制取决于独特的挑战。延迟调试直至提高健康和安全方案,未被发现。因此,在2020年5月,池塘的团队导航了激烈的旅行限制,不断发展的程序和社会疏远准则,以执行至关重要的升级。

著录项

  • 来源
    《Military engineer》 |2021年第732期|71-71|共1页
  • 作者

    Kris Allegood;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号