首页> 外文期刊>The Military Engineer >Preservign While Designing
【24h】

Preservign While Designing

机译:设计时保留

获取原文
获取原文并翻译 | 示例
           

摘要

Design is a crucial factor in the traditional design-build partnership, but it becomes of paramount importance in a project like the recent renovation of the historic 84-year-old Luce Hall, a cornerstone of the U.S. Naval Academy (USNA) campus in Annapolis, Md. In this case, the procurement process challenged the design-build team to exceed design expectations, while the building itself provided many unique challenges. Built in 1920, the building marks the southwest corner of the main USNA yard. Over the years, however, layers of renovations had resulted in a jumble of less than fully functional spaces. In addition, significant upgrades would be required to accommodate today's technologically sophisticated educational environment while preserving the character of the building and the campus, which is a National Register Historic District.
机译:设计是传统设计与建造伙伴关系中的关键因素,但在诸如对历史悠久,具有84年历史的Luce Hall进行的最近翻新中,这是最重要的,Luce Hall是安纳波利斯美国海军学院(USNA)校园的基石在这种情况下,采购过程向设计建造团队提出了超越设计期望的挑战,而建筑本身提出了许多独特的挑战。该建筑建于1920年,是USNA主船场的西南角。然而,这些年来,经过层层翻新,导致杂乱无章的功能空间不足。此外,在保留建筑物和校园的特色的同时,还需要进行重大升级,以适应当今技术先进的教育环境,而校园和校园是美国国家历史登记区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号