首页> 外文期刊>The engineers journal >Celebrating 75 years of the Shannon hydroelectric scheme
【24h】

Celebrating 75 years of the Shannon hydroelectric scheme

机译:庆祝香农水电计划75周年

获取原文
获取原文并翻译 | 示例
           

摘要

This month is the 75th anniversary of the first production of electricity from Ardnacrusha. Paul Duffy recounts the history, design and engineering of this defining engineering project that brought Ireland into the twentieth century and marked the birth of the ESB. The Shannon Scheme was the culmination of a long series of proposals to harness the river for power generation. In 1844, Robert Kane suggested that the area between Killaloe and Limerick could become the industrial heartland of Ireland. He claimed that, if the Shannon were harnessed here, some 34,000 continuous horse power would be available for industrial use. The Famine, however, pushed his ideas into the background. In 1875, there was a major strike by coal miners in Britain, and "the Engineer" suggested that English industrialists should relocate to the Limerick area because of the abundance of readily available water power.
机译:本月是Ardnacrusha首次发电75周年。保罗·达菲(Paul Duffy)讲述了这个具有定义意义的工程项目的历史,设计和工程,该工程项目将爱尔兰带入了20世纪并标志着ESB的诞生。香农计划是一系列利用河流发电的提议的最终结果。 1844年,罗伯特·凯恩(Robert Kane)提出,凯拉洛(Killaloe)和利默里克(Limerick)之间的地区可以成为爱尔兰的工业重镇。他声称,如果香农被利用在这里,大约34,000匹连续马力将可用于工业用途。然而,饥荒把他的想法推向了后台。 1875年,英国的煤矿工人大罢工,“工程师”建议英国工业家应搬迁到利默里克地区,因为这里有大量可用的水力资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号