The M7 Heath Mayfield Motorway is the first large NRA scheme completed through a design and build contract. The Project Engineers' Representative, John Norbury of Amp, describes the partnership approach contributed to the efficient and timely progression of the project. The new Minister for Transport, Martin Cullen T.D., will open the M7 Heath Mayfield Motorway on November 8, 2004.The motorway will fill the 1 7.5km gap between the Portlaoise Bypass, completed in May 1997 and the Kildare Town Bypass, opened last December (The Engineers' Journal Vol 58:01). When the N7 Naas Road widening, for which the contract has recently been awarded, is completed, there will be almost 80 km of grade-separated dual carriageway from Clonkeen, south west of Portlaoise to Newland's Cross on the outskirts of Dublin. The Public Inquiry for the M7 Portlaoise to Castletown - M8 Portlaoise to Cullahill Motorway, located to the southwest from Portlaoise, which includes the junctions between the M7 Limerick and M8 Cork motorways, was held this summer.
机译:M7 Heath Mayfield高速公路是通过设计和建造合同完成的第一个大型NRA计划。 Amp的项目工程师代表John Norbury描述了伙伴关系方法有助于项目的高效及时地进行。新的运输部长马丁·库伦(TD)将在2004年11月8日启用M7希思·梅菲尔德高速公路,该高速公路将填补1997年5月建成的Portlaoise旁路与去年12月开放的基尔代尔镇旁路之间的1 7.5公里差距(工程师杂志,第58卷:01)。 N7纳斯路加宽工程(最近已获得合同)完成后,从波特劳伊斯西南的克伦肯到都柏林郊区的纽兰克罗斯,将有将近80公里的坡道分隔的双车道。 M7 Portlaoise到Castletown的公共询问-M8 Portlaoise到Cullahill高速公路,位于Portlaoise的西南,其中包括M7利默里克和M8 Cork高速公路之间的交叉路口。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号