首页> 外文期刊>The engineers journal >Final 41km section of scheme completes M7/M8 motorway
【24h】

Final 41km section of scheme completes M7/M8 motorway

机译:计划的最后41公里段完成了M7 / M8高速公路

获取原文
获取原文并翻译 | 示例
           

摘要

As the final section of the Dublin to Cork Major Interurban Corridor (MIU), the NRA believes that this road will result in safer, faster and more reliable journey times. The benefits they identify include:1. a section in the Dublin to Limerick Major Interurban (MIU) Corridor which is intended to facilitate safer, faster and more reliable journeys between both cities;2. connects the midlands, south and midwest to Dublin, the east and the north through a high quality reliable road transport corridor;3. improved internal road transport infrastructure between and within regions;4. contributes towards competitiveness of the midlands, mid-west and south.
机译:作为都柏林到科克主要城市间走廊(MIU)的最后一段,NRA认为这条道路将带来更安全,更快和更可靠的旅程时间。他们确定的好处包括:1.都柏林至利默里克主要城市际走廊的一个路段,旨在促进两个城市之间更安全,更快和更可靠的旅程;2.通过优质可靠的公路运输走廊将中部,南部和中西部与都柏林,东部和北部相连;3.改善区域之间和区域内部的内部道路运输基础设施;4.促进中部,中西部和南部的竞争力。

著录项

  • 来源
    《The engineers journal》 |2010年第5期|P.184-187|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号