...
首页> 外文期刊>The army lawyer >Major Systems Acquisitions
【24h】

Major Systems Acquisitions

机译:主要系统收购

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In July 2006, the GAO issued a report on the DoD's failure to obtain sufficient technical data rights for seven major weapons systems. The GAO's objective in undertaking this study was to assess how "Army and Air Force sustainment plans for fielded weapon systems had been affected by technical data rights" and to evaluate "requirements for obtaining technical data rights under current DoD acquisition policies." The GAO made two major findings. First, it found that the Army and Air Force's failure to obtain technical data rights in procuring certain weapons systems had resulted in problems in sustaining these weapons systems. Second, it found that DoD's acquisition policies do not require obtaining technical data rights when procuring major weapons systems. The GAO also made specific recommendations addressing these shortcomings.
机译:2006年7月,GAO发布了一份关于国防部未能获得七种主要武器系统足够技术数据权的报告。 GAO进行这项研究的目的是评估“野战武器系统的陆军和空军维持计划如何受到技术数据权的影响”,并评估“根据当前国防部采购政策获得技术数据权的要求”。 GAO有两个主要发现。首先,它发现陆军和空军在采购某些武器系统时未能获得技术数据权利,导致了维持这些武器系统的问题。其次,它发现国防部的采购政策在采购主要武器系统时不需要获得技术数据权。 GAO还针对这些缺点提出了具体建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号