The London Legacy Development Corporation (LLDC) has rejected claims Heneghan Peng's brightly-coloured Central Park Bridge could remain in 'games mode'following the Olympics. However, a senior source revealed that, due to continued high use of the key route to the Olympic Stadium, the original plans to convert the 54m-wide competition-winning scheme into a more slender structure had been abandoned.
展开▼
机译:伦敦遗产发展公司(LLDC)拒绝了彭于晏(Heneghan Peng)色彩鲜艳的中央公园大桥(Central Park Bridge)的说法,因为奥运会之后,该大桥可能仍处于“游戏模式”。然而,一位资深消息人士透露,由于继续大量使用通往奥林匹克体育场的关键路线,最初计划将5400万宽的比赛获胜方案转换为更苗条的结构,但该计划已被放弃。
展开▼