首页> 外文期刊>Technological forecasting and social change >Investment cost optimization for industrial project portfolios using technology mining
【24h】

Investment cost optimization for industrial project portfolios using technology mining

机译:使用技术挖掘优化工业项目组合的投资成本

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Large technology-intensive enterprises and companies face a constant challenge: How can a set of selected high-tech projects get done in a manner that would minimize the total cost across all projects? In majority of cases, projects are assumed independent, leading to a separate cost evaluation. This assumption often does not hold for real-world project portfolios, frequently sharing overlapping technologies. In this paper, we show how the order of the execution of the projects can directly affect the total cost of the portfolio, due to shared dependencies. Modeling the problems in this area can be achieved by combining two main fields: graph theory and technology mining. A novel method is introduced to create an infrastructure to perceive the dependencies of projects, estimate the cost and optimize the investment cost of the portfolio by considering the priority. This infrastructure utilizes a technology association graph model and then the graph is enhanced in several stages to compute the optimal prioritized order of execution of the projects. We excavate a sub-graph from the primary graph and simplify it to one of the typical models. We show mathematically how this prioritized list minimizes the investment cost in compare with regular method at which costs are calculated separately and ordered by lowest to highest. The proposed model can use other metrics for prioritization such as the ‘value’ that each project can deliver to the organization.
机译:大型技术密集型企业和公司面临着持续的挑战:如何以最小化所有项目总成本的方式完成一组选定的高科技项目?在大多数情况下,项目被认为是独立的,因此需要进行单独的成本评估。这种假设通常不适用于现实世界的项目组合,它们经常共享重叠的技术。在本文中,我们展示了由于共享依赖关系,项目执行的顺序如何直接影响投资组合的总成本。可以通过结合两个主要领域来实现对该领域中问题的建模:图论和技术挖掘。引入了一种新颖的方法来创建基础结构,以通过考虑优先级来感知项目的依存关系,估算成本并优化投资组合的投资成本。该基础架构利用技术关联图模型,然后在多个阶段对图进行增强,以计算项目执行的最佳优先顺序。我们从主图中挖掘一个子图,并将其简化为典型模型之一。与常规方法相比,我们优先级排序列表如何数学地显示出如何使投资成本最小化,在常规方法中,成本是分别计算并按最低到最高顺序排列的。提议的模型可以使用其他指标进行优先级排序,例如每个项目可以交付给组织的“价值”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号