首页> 外文期刊>Team Performance Management >Understanding how team process-sequences emerge over time and their relationship to team performance
【24h】

Understanding how team process-sequences emerge over time and their relationship to team performance

机译:了解团队流程序列如何随着时间的推移出现,以及与团队表现的关系

获取原文
获取原文并翻译 | 示例
       

摘要

Purpose - The purpose of this study was to explore the team process-sequences executed within and across performance episodes and their relation to team performance. In doing so, this effort responds to the call for examining the temporal and dynamic aspects of teams. Design/methodology/approach - Data (i.e. observations and audio recordings) was collected from the stand-up meetings of three high-performing Scrum teams across six points in time during two consecutive performance episodes (i.e. beginning, midpoint, end). After content coding the data, lag sequential analyses was used to examine patterns of executed team processes to determine whether particular process-sequences occurred significantly different from others. Findings - Teams shifted between transition and action phase processes during performance episodes. During and across performance episodes, process-sequences primarily consisted of transition processes. When teams executed process-sequences consisting solely of action phase processes, their focus was on monitoring processes. Research limitations/implications - This study hopes that the findings here will serve to spur researchers to more fully investigate the relationship between process-sequences and team performance across various team types. However, limitations (e.g. small sample size, unknown point of teams' life cycle and focus on explicit team processes) should be taken into account when building on the present findings. Originality/value - This study contributes to a better understanding of the temporal and dynamic nature of team processes by analyzing how the team process and process-sequences occur across time. In addition, this study moves beyond most studies that assess team processes as static retrospective perceptions and consider their natural ordering.
机译:目的 - 本研究的目的是探讨在绩效剧集内执行的团队流程序列及其与团队绩效的关系。在此过程中,这项努力响应呼吁检查团队的时间和动态方面。设计/方法/方法 - 数据(即观察和音频记录)由三个高性能的Scrum团队的站立会议中收集在两个连续的绩效发作期间(即开始,中点,结束)在六个点及时的六个点。在内容编码数据之后,使用LAG顺序分析来检查执行的团队进程的模式,以确定是否发生了特定的处理序列与他人显着不同。调查结果 - 在绩效发作期间转换和行动阶段过程之间转移的团队。在性能剧集期间和跨性能剧集期间,处理序列主要由过渡过程组成。当团队执行的流程序列时,仅仅是行动阶段过程,他们的重点是在监测过程中。研究限制/含义 - 本研究希望这里的调查结果将用于刺激研究人员,以更全面调查各种团队类型的过程序列和团队表现之间的关系。然而,在建立当前调查结果时,应考虑到局限性(例如,小组的样本大小,团队的未知点,并关注明确的团队进程)。原创性/值 - 本研究通过分析在时间跨越时期发生的团队进程和过程序列,更好地了解团队流程的时间和动态性质。此外,本研究超出了大多数研究,评估团队进程作为静态回顾性观念,并考虑其自然排序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号