Establishing Vertical Control on the Hoover Dam Bypass-Colorado River Bridge

机译:建立胡佛水坝旁路-科罗拉多河大桥的垂直控制

获取原文
获取原文并翻译 | 示例
           

摘要

The use of reciprocal trigonometric leveling with reciprocal zenith angles for vertical control will meet the 0.005-ft vertical tolerance specification for arch construction layout. rnThe science and processes of surveying take on many faces and have numerous assumptions tied to them. Many people see surveying" as an exact science with definite results and absolute answers. Whether the solution to be obtained is the resolution of a boundary, the proper geodetic application of a large-scale project coordinate system, or construction staking within a local project site, there will invariably be both systematic and random errors. It is the surveyor's job to be aware of all potential sources of measurement error. In deciding which survey methods are appropriate, one must consider factors such as the sources of error propagation inherent with each method, the economics of each method, the type of measurement required, and other related factors.
机译:在垂直控制中使用具有互逆天顶角的双向三角水准将满足拱结构布局的0.005英尺垂直公差规范。 rnrn测量的科学和过程具有许多面,并且有许多与之相关的假设。许多人将“测量”视为一门具有明确结果和绝对答案的精确科学。无论要获得的解决方案是边界的分辨率,大型项目坐标系的正确大地测量应用,还是当地项目场地内的建筑桩,系统误差和随机误差总是一样,测量人员必须了解所有潜在的测量误差源,在确定哪种测量方法合适时,必须考虑各种因素,例如每种方法固有的误差传播源。 ,每种方法的经济性,所需的测量类型以及其他相关因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号