...
首页> 外文期刊>SpentFUEL >An Overview of Canada’s Nuclear Waste Management Plan as Detailed in NWMO’s Annual Report
【24h】

An Overview of Canada’s Nuclear Waste Management Plan as Detailed in NWMO’s Annual Report

机译:在NWMO年度报告中详述的加拿大核废物管理计划概述

获取原文
获取原文并翻译 | 示例

摘要

In March, Canada’s Nuclear Waste Management Organization (NWMO) submitted its annual report, “Moving towards Partnership – Annual Report 2018,” to the Honorable Amarjeet Sohi, Minister of Natural Resources, as is required under the Nuclear Fuel Waste Act (NFWA). The report highlights the organization’s progress in implementing Canada’s plan for the management and disposition of spent nuclear fuel. The NWMO also published the latest update to its fiveyear strategic plan – Implementing Adaptive Phased Management 2019 to 2023. This plan outlines objectives and priorities for NWMO as it continues to implement the country’s plan for the safe, long-term management of spent fuel. The agency is working towards identifying a preferred site for Canada’s deep geological repository over the next five years. In 2002, the government of Canada assigned responsibility through the NFWA for the long-term management of the country’s spent nuclear fuel to NWMO, which operates on a not-for-profit basis. The organization was established by Canada’s major nuclear fuel waste owners: Ontario Power Generation, Hydro-Québec, and New Brunswick Power Corporation. After a three-year dialogue (2002-2005) with Canadians, including Indigenous peoples, Canada developed its plan, called Adaptive Phased Management (APM), which was outlined in a study that was issued in November 2005. The government selected APM as Canada’s plan for the long-term management of spent fuel in June 2007. The NWMO explained the APM is both a technical method and a management system that involves phased and adaptive decision- making supported by public engagement and continuous learning.
机译:3月份,加拿大核废物管理组织(NWMO)提交了其年度报告,“2018年年度报告 - 2018年年度报告”,自然资源部长,自然资源部长,正如核燃料废物法(NFWA)所必需的那样。该报告强调了本组织在执行加拿大管理和处置核燃料计划方面的进展情况。 NWMO还将最新的最新更新公布为其五年级战略计划 - 实施2019年至2023年的自适应相控管理。该计划概述了NWMO的目标和优先事项,因为它继续实施该国的安全,长期管理燃料的管理计划。该机构正在努力在未来五年内识别加拿大深层地质储存库的首选网站。 2002年,加拿大政府通过NFWA指定了该国将军的长期管理到NWMO的长期管理,该公司以非营利性为基础运营。该组织由加拿大的主要核燃料废物业主建立:安大略省发电,Hydro-Québec和新的布伦瑞克电力公司。在一个三年的对话(2002-2005)加拿大人(2002-2005),包括土着人民,加拿大制定了它的计划,称为自适应相控管理(APM),该计划在2005年11月发布的一项研究中概述。政府选择APM作为加拿大的计划于2007年6月的长期管理燃料的计划。NWMO解释了APM既是技术方法和管理系统,也涉及公众参与和持续学习的分阶段和适应性决策。

著录项

  • 来源
    《SpentFUEL》 |2019年第1255期|1-3|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号