首页> 外文期刊>Space news >Changes to Award Fee Contracting Needed
【24h】

Changes to Award Fee Contracting Needed

机译:需要更改授予合同的费用

获取原文
获取原文并翻译 | 示例
           

摘要

The Award Fee has been the staple of Air Force incentive arrangements for the past 25 years or more. It offers the opportunity to leverage performance through the use of subjective criteria and gives power to the Fee Determining Official (FDO) unlike almost any other contract type. The Space & Missile Systems Center is reviewing the use of Award Fee Incentives in light of a December 2005 GAO report that was highly critical of the way fees have been awarded on programs that have not performed as well as predicted.
机译:过去25年来,奖励费一直是空军奖励计划的主要内容。它提供了通过使用主观标准来提高绩效的机会,并赋予了收费确定官员(FDO)权力,这几乎与其他任何合同类型不同。太空与导弹系统中心正在根据GAO于2005年12月发布的一份报告,对奖励费奖励措施的使用进行审查,该报告对未按计划执行的计划的奖励费方式提出了高度批评。

著录项

  • 来源
    《Space news》 |2006年第27期|p.19|共1页
  • 作者

    JAMES GILL;

  • 作者单位

    University of Southern California's Defense & Strategic Studies Program;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 航空、航天;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号