首页> 外文期刊>Solar Energy >Feasibility study of off-shore wind farms: an application to Puglia region
【24h】

Feasibility study of off-shore wind farms: an application to Puglia region

机译:海上风电场的可行性研究:在普利亚地区的应用

获取原文
获取原文并翻译 | 示例
       

摘要

Recent environmental constraints and new secure technologies have enforced the development of comprehensive programmes for renewable energy. Wind energy is one of the most promising solutions, especially considering its technological advancements and its growth over the last years. In particular, off-shore wind energy is a key element in the EU White Paper target of 10% contribution of Renewable energy by 2010. In this paper, the technical and economical feasibility of off-shore wind farms is reviewed, in order to evaluate profitability and investment opportunities. In particular, a pre-feasibility study of off-shore wind farms to some selected sites in Puglia Region is provided. The study indicates the best sites in Puglia Region for off-shore plants. For each site, the cost of energy and the profitability of the investment are calculated. Moreover, in the most promising site, different wind turbine generators (WTGs) models are compared in order to evaluate the best performances. In the best site, which presents an average wind speed at 35 m height of 7.66 m/s, the cost of energy ranges between 5.2 and 6.0 c?/ kWh. Moreover, the analysis shows that the use of large size WTGs allows reducing the cost of energy and increasing the profitability of the wind farm.
机译:最近的环境限制和新的安全技术迫使开发可再生能源的综合计划。风能是最有前途的解决方案之一,尤其是考虑到其技术进步和最近几年的增长。特别是,海上风能是欧盟白皮书关于到2010年实现可再生能源贡献10%的目标的关键要素。在本文中,对海上风电场的技术和经济可行性进行了评估,以评估盈利能力和投资机会。特别是,提供了对普利亚大区某些选定地点的海上风电场的预可行性研究。该研究指出了普利亚大区近海植物的最佳种植地点。对于每个站点,都将计算能源成本和投资的获利能力。此外,在最有希望的站点中,比较了不同的风力涡轮发电机(WTG)模型,以评估最佳性能。在最佳地点,其在35 m高度处的平均风速为7.66 m / s,能源成本在5.2至6.0 c?/ kWh之间。此外,分析表明,使用大型WTG可以降低能源成本并提高风电场的盈利能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号