首页> 外文期刊>Smart Grid, IEEE Transactions on >Peak Load Curtailment in a Smart Grid Via Fuzzy System Approach
【24h】

Peak Load Curtailment in a Smart Grid Via Fuzzy System Approach

机译:基于模糊系统的智能电网峰值负荷削减

获取原文
获取原文并翻译 | 示例
           

摘要

Among many significant smart grid initiatives and challenges considered by many utilities and within the research community, are those associated with the energy management and conservation, in particular the management of energy demand during peak load periods. In this paper, a novel method for peak load curtailment by using a fuzzy system approach is presented. The proposed method is based on the application of fuzzy logic principles for peak load curtailment in a smart grid environment. The inputs to the system are the utility peak load data consisting of many energy demand scenarios, and the outputs are the necessary demand response power reductions required for the load curtailment during the peak load periods. The proposed method considers different peak load profiles and power consumption sources for multiple city regions. Furthermore, it is adaptable for use in many scenarios, such as those encompassing many input sources of power consumption with diverse input parameters of control (i.e., temperature offsets, duty cycle control, etc.) within numerous city regions. Thus, it can be applied to multiple output variables of control.
机译:在许多公用事业公司和研究界内部考虑的许多重要智能电网计划和挑战中,包括与能源管理和节约相关的那些计划,尤其是高峰时段的能源需求管理。本文提出了一种采用模糊系统方法削减峰值负荷的新方法。所提出的方法基于模糊逻辑原理的应用,以减少智能电网环境中的峰值负载。系统的输入是包含许多能源需求方案的公用事业峰值负荷数据,输出是峰值负荷期间削减负荷所需的必要需求响应功率降低。所提出的方法考虑了多个城市区域的不同峰值负载曲线和功耗源。此外,它适用于许多场景,例如那些包含许多功率消耗的输入源的场景,在许多城市区域内具有各种输入控制参数(即温度偏移,占空比控制等)。因此,它可以应用于控制的多个输出变量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号