Since the late 1970s, nourished sand provided by the federal shore protection project at Upham Beach, Florida, has routinely eroded within two years of placement. The erosion problem is a result of the location of the beach immediately downdrift of a total littoral barrier and pre-control line construction in a seaward-advanced position. This 2,400-ft-long nourishment project is considered a "feeder beach" because fill is placed along the updrift end of a 2.5-mi region intended to receive sediment. The need to retain a protective beach and to address the negative public perception of a rapidly eroding project gave rise to the structural solution described in this paper. The geotextile T-groin project that was installed in 2005 included advance downdrift mitigation and a long-term monitoring plan. The structures were also designed to withstand extended exposure, high wave energy, and significant scour that typically occur at this location. Although construction of the $1.5 million project was challenging, the preliminary performance of the T-groins is promising. As a result of the structures, the public beach at the project site was 100 ft wider two years after the 2004 nourishment project, as compared to two years after the 2000 nourishment project. The T-groin project has successfully maintained Upham Beach with no downdrift impacts. Based on the performance of the temporary structures over the next several years, an application for similar rock structures may be submitted in the future.
机译:自1970年代后期以来,由佛罗里达州Upham Beach的联邦海岸保护项目提供的营养沙在放置后的两年内经常受到侵蚀。侵蚀问题是由于海滩位置立即沿整个滨海屏障向下漂移,并且预控制线结构处于朝海位置。这个2400英尺长的营养项目被认为是“饲草滩”,因为填充物沿着2.5英里区域的上流端放置,用于接收沉积物。保留保护性海滩和解决公众对快速侵蚀项目的负面看法的需求产生了本文所述的结构性解决方案。 2005年安装的土工布丁字裤项目包括提前缓解漂流和制定长期监测计划。该结构还被设计为可以承受长时间的暴露,高波能以及通常发生在该位置的强烈冲刷。尽管这个耗资150万美元的项目的建设具有挑战性,但T型腹股沟的初步性能令人鼓舞。由于结构的原因,与2000年营养项目后的两年相比,2004年营养项目后两年,项目现场的公共海滩宽100英尺。 T型腹股沟项目成功地维护了Upham海滩,而没有下沉影响。根据未来几年中临时结构的性能,将来可能会提交类似岩石结构的申请。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号