首页> 外文期刊>Ships monthly >Virginia blocked
【24h】

Virginia blocked

机译:弗吉尼亚州被封锁

获取原文
获取原文并翻译 | 示例
       

摘要

Progress on the US Navy's first Block Ⅲ variant of the Virginia class attack submarine has been delayed due to problems with a parts supplier and the need for additional design and certification work on the redesigned bow. The issue with North Dakota (SSN 784) is a setback to the project, which has gained a reputation hitherto for delivering in advance of the contracted delivery date. Although the vessel is the 11th Virginia class boat, she is the first with a redesigned bow section featuring two Virginia Payload Tubes (VPTs) and a reconfigured sonar sphere containing a Large Aperture Bow array. The innovative VPTs are able to store and launch a variety of weapons or vehicles. Electric Boat still expects to deliver the sub ahead of the August contract delivery date.
机译:由于零件供应商的问题以及重新设计的船首需要进行额外的设计和认证工作,美国海军第一艘弗吉尼亚级攻击潜艇的BlockⅢ变体的研制工作被推迟了。北达科他州(SSN 784)的问题是该项目的挫折,迄今为止,该项目因在合同规定的交货日期之前交货而享有盛誉。尽管该船是弗吉尼亚州的第11艘船,但它是第一艘经过重新设计的船首部分,具有两个弗吉尼亚州有效载荷管(VPT)和经过重新配置的包含大孔径船首阵列的声纳球体。创新的VPT能够存储和发射各种武器或车辆。 Electric Boat仍希望在8月合同交货日期之前交货。

著录项

  • 来源
    《Ships monthly》 |2014年第7期|15-15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:42:58

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号